Cold room panel thickness follows the temperature difference the wall has to hold, not the name of the room behind it. A chiller at 0°C to +8°C in a 35°C plant is usually built from 75 mm to 100 mm panels, a freezer at -20°C from 120 mm to 150 mm, and a blast freezer at -35°C from 180 mm to 200 mm. Those bands are where commercial projects tend to land, not a fixed rule. The final number comes from the ambient design condition, the tariff the plant pays for power, the moisture the envelope will meet, and how well the joints are built.
Why one panel thickness cannot serve a chiller and a freezer
A cold room panel does three jobs at once. It slows heat passing through the envelope, it keeps both faces away from the surface conditions that cause condensation or frost, and it carries its own weight plus whatever is fixed to it. Thickness affects all three, but in different proportions, which is why the same 100 mm sandwich that works at +4°C is a poor choice at -25°C.
The governing quantity is the temperature difference across the panel. A chiller holding +4°C in a 35°C plant works against roughly 31 K. A freezer at -20°C works against 55 K, and a blast freezer at -35°C against 70 K. Heat flow rises in proportion to that difference, so the freezer wall already carries close to twice the load of the chiller wall before thickness enters the discussion.
Two further effects separate the duties. Foam conductivity rises as the mean temperature of the core falls, so a PIR or PUR core performs slightly worse in a freezer than its declared value measured at a 10°C mean suggests. The direction of moisture drive also reverses. In a chiller, vapor generally moves from the warm plant toward the room; in a freezer it moves inward through the envelope and can freeze inside the core or at a joint, where it works the seam open season by season.
Copying a freezer schedule onto a chiller project, or the reverse, produces the wrong building rather than a safer one. Over-thick panels in a chiller spend capital and eat storage volume. Under-thick panels in a freezer cost compressor hours every day the plant runs.
How panel thickness changes heat gain and compressor load
The steady state arithmetic is short enough to do by hand. Thermal transmittance is conductivity divided by thickness, U = λ / d, with λ in W/(m·K) and d in meters. Heat flux per square meter is q = U × ΔT, and multiplying by envelope area and annual running hours gives the conduction share of the yearly energy bill. The calculation method for building components is standardised in ISO 6946:2017 [1].
Take a PIR core declared at λ = 0.023 W/(m·K), a freezer at -20°C in a 35°C plant, so ΔT = 55 K. At 100 mm, U = 0.23 W/(m²·K) and q = 12.7 W/m². At 150 mm, U = 0.153 and q = 8.4 W/m². At 200 mm, U = 0.115 and q = 6.3 W/m².
The pattern matters more than the individual figures. Moving from 100 mm to 150 mm removes 4.3 W/m² of continuous load. Moving from 150 mm to 200 mm removes 2.1 W/m², roughly half as much, while adding panel cost and taking another 50 mm out of usable width on every wall. Past a certain point the next layer of foam is a weak buy compared with spending the same money on a tighter door, better defrost control, or a larger evaporator.
Put an area on it. On a 300 m² envelope, 4.3 W/m² is 1.29 kW of continuous load, which is about 10,300 kWh over an 8,000 hour year. That is the number to set against the price gap between the two panel builds and the tariff the site actually pays. Where power is cheap and the project life is short, the thinner panel can win. Where the room runs around the clock for fifteen years on an expensive tariff, the answer usually moves the other way.

Conduction is the permanent part of the load, so it is also the part that most affects the business case for the whole building. <Cold Storage Project ROI: A Practical Financial Evaluation> covers how capital cost and running cost are weighed together in a cold storage investment case.
Keep the result in proportion. Conduction is only one component of the load. Door openings, product entry, defrost cycles, lights, people and air infiltration can each exceed it in a busy room. Thickness is where the fixed part of the load is decided, and it is also the part that cannot be changed later without rebuilding the room.
Matching thickness to the temperature zone
| Room duty | Room temperature | Difference to a 35°C ambient | Thickness commonly specified | What confirms the final value |
|---|---|---|---|---|
| Processing and packing | +10°C to +15°C | 20 to 25 K | 50 mm to 75 mm | Internal surface stays above the dew point of the room air |
| Chiller | 0°C to +8°C | 27 to 35 K | 75 mm to 100 mm | Heat gain compared against the local electricity tariff |
| Freezer | -18°C to -25°C | 53 to 60 K | 120 mm to 150 mm | Vapor seal and floor detail at the joints |
| Blast freezer | -30°C to -40°C | 65 to 75 K | 180 mm to 200 mm | Panel span, door heater load and pull-down capacity |
| Deep freeze | below -40°C | above 75 K | 200 mm with enhanced sealing | Joint design and defrost strategy |
The chiller band is wider than it looks. A 0°C room for fresh fish sits much closer to freezer duty than a +8°C vegetable room does, and 75 mm suits a mild climate with light traffic while 100 mm suits a hot plant or a room with constant door activity.

Freezers are the least forgiving. At -18°C and above 30°C ambient, 150 mm is the common answer, with 120 mm workable in cooler climates where the panel cost matters more than the running cost. The floor usually carries a separate detail, because it sits against the ground rather than against air, and a freezer floor typically needs underfloor frost protection regardless of the wall thickness chosen.
Blast freezers move the problem from steady load to peak load. A -35°C room at 180 mm to 200 mm is built for pull-down speed and for the thermal shock of repeated cycling, so the panel span and the door heater load often drive the specification as much as the insulation value does.
evaporator)
A chiller room in a hot climate is where the most thickness is wasted on the wrong thing. Extra foam cannot compensate for a door opened every few minutes, and the load that follows the door traffic usually outweighs whatever the wall saves.
The 0°C to +10°C band has its own configuration rules that a freezer schedule does not cover. <Chiller Room Solutions -10C~10C> covers how that temperature range is set up in commercial practice.
Moisture, condensation and hot climates
Thickness sets the heat flow, but continuity sets the moisture performance, and the two are not interchangeable. A 200 mm panel with a badly sealed joint leaks vapor at the seam; a 150 mm panel with a continuous seal and a properly detailed floor does not. The standard method for checking whether a surface will stay above the critical humidity threshold is ISO 13788:2012 [2], and it is worth running on the coldest bridging element in the room rather than only on the flat wall.
Every metal element that bridges from the cold side to the warm side becomes a condensing surface. Uninsulated door frames, hanger brackets, pipe penetrations, fixing screws that run through the panel, and the slab edge at a freezer floor are the usual culprits. In a hot humid plant with air at 32°C and 80% relative humidity, the dew point sits close to 28°C, so any surface below that will run wet. The visible drip is only the symptom; the damage happens where moisture enters the core and stays there.
Freezer rooms add frost heave. Water in the ground below a sub-zero floor freezes, expands and lifts the slab, and no wall thickness prevents it. Underfloor heating cables or a ventilated void belong in the drawing set before the panel schedule is fixed.
Ambient design conditions decide whether another 25 mm is cheap insurance or wasted capital. <Cold Room Project Saudi Arabia: High Ambient Gulf Design> covers cold room design for high ambient Gulf conditions.
Core, density and fire class behind the thickness number
Two panels of the same thickness are not the same panel. PUR and PIR cores behave differently at temperature and under fire exposure. PIR typically carries a higher continuous service temperature and a better reaction to fire classification at similar density, while PUR is generally cheaper and remains common in chiller rooms where the fire requirement is light. Declared conductivity for the two is often close, so the fire classification rather than the insulation value is frequently the deciding difference.
Density is the quieter variable. A low-density core at 150 mm insulates less than a well-made core at the same thickness, and it is more likely to sag across a ceiling span. Ask for the declared density and compressive strength with the test standard attached, not a single number on a brochure.
| Record | Conditions it was measured under | What it can support | What it cannot support |
|---|---|---|---|
| Declared λ of 0.023 W/(m·K) for a PIR core | Laboratory test on a dry sample at a stated mean temperature, as declared by the panel maker | Comparing two cores at equal thickness under those conditions | That the core still delivers 0.023 after years of moisture pickup, or at a -35°C mean |
| B-s1,d0 reaction to fire class | Small specimen classified to EN 13501-1 [4] | Comparing core materials by classification | That an assembled room with doors, sealant and pipe penetrations performs identically |
| A project running 150 mm panels at -20°C | One installation, one climate, one operating pattern | That 150 mm has been used successfully at that condition | That 150 mm is the cost optimum at another tariff or another ambient |
The panel itself is a manufactured product, and EN 14509:2013 [3] sets out the specifications for factory made double skin metal faced insulating panels, including dimensional tolerances and flatness. Those tolerances matter at the joint, where a few millimeters of mismatch becomes a path for air and vapor.

The practical sequence is core first, then declared conductivity with its mean temperature, then density, then fire classification, and only then thickness. Choosing thickness first and fitting the core around it usually means paying for foam that a thinner, better core would have replaced.
Where thickness is wasted or under-specified
The single most common loss is the door. A 200 mm wall paired with a poorly sealed or unheated door gives away more load in a shift than the wall saves in a year. Door width, opening frequency, heater rating and gasket condition belong in the same conversation as panel thickness.

Panel joints come next. Cam-lock eccentric fasteners, the gasket between panels, and the sealant at every penetration decide how much vapor actually reaches the core. Two rooms built to the same drawing with different joint workmanship will not age the same way, and no amount of thickness compensates for an open seam.
Ceiling spans deserve their own check. A thicker panel often spans further between hangers, which can reduce steel and installation time, but it also adds weight. Confirm the deflection limit rather than assuming thicker is automatically stronger.
Floor construction is specified by different rules. In a freezer the floor sits against the ground, so its thickness is set by floor load, frost protection and the detail at the wall junction rather than by the air temperature difference on the walls.
Finally, count the volume. Moving every wall from 100 mm to 200 mm costs half a meter of usable width across a small room, and that loss is permanent. The right question is not which panel is thickest but which combination of core, thickness, door and joint delivers the room temperature at the lowest total cost over the life of the building.
A panel specification checklist for the RFQ
| RFQ field | What to ask for | Why it matters |
|---|---|---|
| Design conditions | Room temperature, ambient dry bulb and relative humidity, door openings per shift | Sets the temperature difference and the condensation check |
| Core and conductivity | PUR or PIR, declared λ with the test method and mean temperature | A thickness without a stated λ cannot be verified |
| Density and strength | Foam density, compressive strength and the test standard | Low-density foam insulates less and sags on ceilings |
| Panel build | Skin thickness and coating, joint type, gasket specification | Joint quality decides real performance more than another 25 mm |
| Fire classification | Classification report number to EN 13501-1, including smoke and droplet sub-classes | The class must apply to the product supplied, not to a brochure |
| Scope of supply | Walls, ceiling, floor, doors, sealant, pipe penetrations, installation supervision | A price per square meter hides the details that leak |
A vague line invites a vague quote. Reject this: 150 mm PU panels, cold room. Replace it with: PIR core, declared λ 0.023 W/(m·K) at 10°C mean, 150 mm walls and ceiling, floor detail drawing with frost protection, cam-lock joints with specified gasket, fire classification report number, and the installation tolerance for joint sealing.
Four checks close the loop before the order is placed. Confirm the fire report number matches the product actually being supplied. Confirm the declared λ is quoted at a stated mean temperature. Confirm the density and compressive strength appear on the data sheet with a test standard. Confirm the freezer floor detail exists as a drawing, not as a sentence in the quotation.
Confirm the panel build before the room is ordered
Send the room temperature, the ambient design condition, the room dimensions and the number of doors, and ask for a panel schedule that states the core, the thickness for each surface, the joint type, the door specification and the floor detail. That document is what the factory builds from, and it is far easier to correct before production than after the panels arrive on site.
Shanghai Meluck Refrigeration Equipment Co., Ltd supplies PUR and PIR cold room panels, doors and matching refrigeration equipment, and can return a panel schedule against your design conditions. Email meluck@meluckcooling.com or call +8617369893087 with the room data, and state the product, the daily throughput and the tariff you operate on so the thickness comparison reflects your site rather than a default.
FAQ
Is 100 mm enough for a -18°C freezer room?
Usually not at a 35°C ambient. That pairing gives a temperature difference of about 53 K, and most commercial freezers at that duty are specified at 120 mm to 150 mm. A 100 mm panel can hold the temperature in a mild climate with a short operating life and cheap power, but the joints and vapor seal then carry more of the burden. Run the conduction calculation with your own ambient and tariff before accepting the thinner build.
Does a thicker panel always reduce running cost?
It reduces conduction load in every case, but the saving per step shrinks as the panel gets thicker. Going from 100 mm to 150 mm removes roughly twice the heat flow that going from 150 mm to 200 mm does. Since door openings, product load and defrost can each exceed the conduction load, the honest answer is that thickness reduces one part of the bill while the operating pattern decides the rest.
What is the difference between 100 mm PUR and 100 mm PIR?
Same thickness, different core chemistry. PIR generally offers a better reaction to fire classification and a higher continuous service temperature, while PUR is usually cheaper and remains common in chiller rooms. Declared conductivity for the two is often close, so the choice usually turns on the fire requirement your insurer or local authority applies, not on the insulation value alone.
Can I add thickness later if the room runs warm?
Rarely in practice. Panels are structural, the joints are sealed, and doors, floors and penetrations are all built around the chosen thickness. The workable options later are usually to improve door seals and strip curtains, raise evaporator capacity, reduce defrost losses, or cut air infiltration. Getting the panel schedule right at design stage is far cheaper than correcting it on a working room.
References
[1] ISO 6946:2017, "Building components and building elements: Thermal resistance and thermal transmittance: Calculation methods," ISO, 2017.
[2] ISO 13788:2012, "Hygrothermal performance of building components and building elements: Internal surface temperature to avoid critical surface humidity and interstitial condensation: Calculation methods," ISO, 2012.
[3] EN 14509:2013, "Self-supporting double skin metal faced insulating panels: Factory made products: Specifications," CEN, 2013.
[4] EN 13501-1:2018, "Fire classification of construction products and building elements: Classification using data from reaction to fire tests," CEN, 2018.
If you're interested, check out these related articles:
Cold Room Project Saudi Arabia: High Ambient Gulf Design
Compressor Room Airflow for Cold Storage: Design Factors
Cold Room Projects Ethiopia: Flowers and Food Cold Chain
Cold Room Project Kenya: High Ambient Equipment Selection
With over 15 years of experience as a MELUCK refrigeration engineer, I specialize in the design of cold storage, chillers, ice makers, and cold chain energy-saving systems, providing technical support to distributors and engineering companies worldwide.
meluck